Tamil Nadu

Chennai Metro

  • 2 lines
  • 42 stations
  • 2 interchanges
Chennai

Last Updated: Last Data Check:

About Chennai Metro

Chennai Metro, operated by CMRL (Chennai Metro Rail Limited) — a 50:50 joint venture of the Tamil Nadu government and the Centre — opened on 29 June 2015 and now runs two colour-coded lines across ~54 km. It was the second metro system in South India (after Bangalore), and is in the middle of a massive Phase 2 build-out that will roughly triple the network.

2008–09 – CMRL formed (DPR prepared by DMRC); construction began after approvals.
29 June 2015 – First elevated stretch (Koyambedu–Alandur) opens.
21 Sept 2016 – Blue Line reaches Chennai International Airport — direct airport metro connectivity.
2017–2019 – Underground sections through the city core (Chennai Central, Nehru Park, Government Estate, High Court) open, completing Phase 1.
7 Feb 2021 – Blue Line extended to Wimco Nagar (~9 km), bringing metro to north Chennai.
2019–present – Phase 2 (3 corridors, ~116 km, 128 stations) sanctioned and under construction, with tunnelling substantially advanced on key stretches.

Chennai Metro lines

Chennai Metro interchange stations

Where you can change from one line to another.

Chennai Metro stations

Show 18 more stations

Chennai Metro first and last train

Earliest first train and latest last train recorded on each line. Exact times differ by station and direction, so open a station page or the timetable for a specific stop.

Line Day First train Last train
Blue Line Weekday 04:51 23:00
Blue Line Saturday 05:00 23:00
Green Line Weekday 04:55 23:17
Green Line Sunday 05:00 23:00

Chennai Metro timings and fares

First and last train

Check service hours and how often trains run at any station.

Open timetable

Ticket price

Pick two stations to see the fare for the trip.

Check fare

More about Chennai Metro

Helpline no. 1860 425 1515