Karnataka

Bengaluru Metro

  • 3 lines
  • 83 stations
  • 2 interchanges
Bengaluru

Last Updated: Last Data Check:

About Bengaluru Metro

Namma Metro, run by the Bangalore Metro Rail Corporation Ltd. (BMRCL) — a 50:50 joint venture of the Karnataka government and the Centre — is India's second-longest metro network after Delhi Metro. The first metro in South India opened on 20 October 2011 (Baiyappanahalli–MG Road), and the system has since grown into a 3-line, ~76–78 km network, with two more corridors under construction and a third phase approved.

2006 – Foundation laid; BMRCL formed as the SPV.
2011 – First section (Reach 1: Baiyappanahalli–MG Road) opens — South India's first metro.
2014–2017 – Green Line built out in stages from Malleshwaram/Peenya to Yelachenahalli; Phase 1 (Purple + Green, ~42 km) completed.
2021 – Purple Line extended to Kengeri.
2023 – Purple Line extended east to Whitefield and west to Challaghatta, creating the full 43 km through-corridor.
2025 – A landmark year: the Yellow Line (Bommasandra–RV Road, serving the Electronics City IT belt) opened in August, and the Green Line reached Madavara.

Bengaluru Metro lines

Bengaluru Metro interchange stations

Where you can change from one line to another.

Bengaluru Metro stations

Show 59 more stations

Bengaluru Metro first and last train

Earliest first train and latest last train recorded on each line. Exact times differ by station and direction, so open a station page or the timetable for a specific stop.

Line Day First train Last train
Green Line Weekday 05:00 23:05

Bengaluru Metro timings and fares

First and last train

Check service hours and how often trains run at any station.

Open timetable

Ticket price

Pick two stations to see the fare for the trip.

Check fare

More about Bengaluru Metro

Helpline no. 1800 425 12345